ANKARA METRO M2 LINE
In the parts mentioned below in the application phase of Ankara Metro; Engineering project services were provided in Architectural, Mechanical, Electrical and Construction Application works.
![KIZILAY TBM.jpg](https://static.wixstatic.com/media/fc758a_cd229e092e7b4a39ae671b4e9d9f42ad~mv2.jpg/v1/fill/w_377,h_282,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/KIZILAY%20TBM.jpg)
01
Route and Main Line Tunnels
5 km TBM tunnel line design between Kızılay-Söğütözü Stations
02
Necatibey Station
![1.jpg](https://static.wixstatic.com/media/fc758a_501e511c053a43d3aca53ee9b59fb147~mv2.jpg/v1/fill/w_377,h_228,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/1.jpg)
![hat-4.png](https://static.wixstatic.com/media/fc758a_276deac329e74b4dab2f021c9a495be1~mv2.png/v1/fill/w_377,h_229,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/hat-4.png)
Milli Kütüphane Station